
What a turnkey exhibition stand includes, how it runs from brief to dismantling, how much it costs per square metre and how much time it takes.
Taking part in a trade show requires dozens of decisions: design, materials, graphics, lighting, transport, installation, the organiser’s permits. With a turnkey exhibition stand all these activities pass to a single partner, who delivers the stand finished and ready to welcome visitors. The exhibiting company focuses only on products, clients and contacts.
In this guide we look at what a turnkey service really includes, how it works step by step, how much it costs and how much time it takes. To explore individual topics, also read our guide to exhibition stand design and the one on stand prices.
In short: a single contact from brief to dismantling; a custom 3D design for the brand; workshop production and trial assembly; graphics, lighting and multimedia included; transport, installation and paperwork with the organiser; support during the event. The more shows you do with the same stand, the more it pays.
1. What “turnkey” means
Turnkey means the supplier handles the whole cycle: idea, design, production, logistics, installation, support and dismantling. You sign one contract and have one project manager. You don’t have to coordinate carpenter, printer, electrician and haulier, or chase the organiser’s deadlines and forms.
| 🧩 Activity | 🔧 DIY / several suppliers | ✅ Turnkey |
|---|---|---|
| ✏️Design and 3D renderings | Design studio | Included |
| 🏭Production of structures and furniture | Joinery | Included |
| 🖨️Graphics and printing | Print shop | Included |
| 💡Lighting and electrical installation | Electrician | Included, with certificates |
| 🚚Transport and installation | Haulier and crew | Included |
| 📋Paperwork with the organiser | Up to you | Handled by the supplier |
2. The brief: goals, budget and constraints
Everything starts with a meeting, in person or online. The information that will guide the project is gathered: show, hall and number of open sides, square metres, products to display, goals (new leads, product launch, client meetings), budget and brand image. A good brief also states how many shows will be done with the same stand: this determines the choice between rental and purchase.
Before this meeting it is worth preparing the floor plan of the area, the show’s technical manual and the logo in vector format. If it is your first time exhibiting, our guide on how to prepare for your first trade show will help.
3. 3D design and detailed quote
The designer turns the brief into a concept: stand plan, visitor routes, areas for display, welcome, meetings and storage. The client receives realistic 3D renderings, usually with one or two revisions included, and an itemised quote. After approval, detailed drawings are prepared and the project is sent to the organiser where required (for example for double-deck stands or tall structures).
4. Workshop production
Walls, counters, showcases and furniture are produced in the workshop with materials certified for exhibition use (the required fire reaction class). A good supplier trial-assembles the stand in the workshop before departure: measurements, joints, finishes and services are checked. At the show there are then no surprises and build-up times are shorter.
In the same period graphics are printed, lights, screens and connections are prepared, and rental furniture, plants and accessories are ordered. Find out more in our guide to custom stand building.
5. Transport and installation at the show
The stand travels packed and numbered, together with tools and spare parts. The installation crew arrives on the build-up days set by the organiser, lays flooring, walls and ceilings, connects the electrical installation and carries out the required checks. On the last day graphics, furniture and products are installed, the stand is cleaned and handed over to the client. The stages are explained in our guide to build-up and dismantling.
6. Support during the show and dismantling
During the show days a technician remains on call for small interventions: a light to adjust, a graphic to fix, a screen to restart. Once the show closes, the crew dismantles the stand within the set times, packs it and takes it back to the warehouse. If the stand belongs to the client, it stays in storage until the next show, ready to be adapted to a new floor area.
7. How much a turnkey stand costs
| 🏗️ Type of stand | 💶 Indicative cost |
|---|---|
| 🧱Customised modular, rented | €150 to €250/m² |
| ✨Custom, rented | €200 to €350/m² |
| 🏠Custom, owned | €350 to €700/m² |
| 🏛️Island or double-deck | €700 to €1,200/m² and above |
Prices include design, production, graphics, lighting, transport, installation and dismantling. Usually excluded are space rental from the organiser, electrical and water connections and daily cleaning. For a full breakdown, read our guide how much an exhibition stand costs.
💬 Have a trade show in your calendar? Send us the show name, square metres and open sides: we will prepare an idea and a free estimate. Ask for an estimate →
8. Timing: when to start
| 🗓️ Stage | ⏱️ When |
|---|---|
| 🤝Brief and first meeting | 4–6 months before the show |
| 🖥️3D design and revisions | 2–3 weeks |
| 🏭Production and trial assembly | 3–6 weeks |
| 🔧Transport and installation at the show | 2–5 days before opening |
| 📦Dismantling | 1–2 days after closing |
For major international shows it is worth starting even earlier: build-up dates are fixed and the best suppliers are booked months in advance.
9. How to choose a turnkey supplier
- Own production. Those who build in their own workshop control quality and timing.
- A dedicated project manager. One contact, reachable during the show too.
- An itemised quote. It must be clear what is included and what isn’t.
- Experience abroad. Logistics, regulations and languages change from country to country.
- A real portfolio. Ask for photos of built stands, not just renderings.
More useful criteria can be found in our article on exhibition stand builders.
What is and isn’t included in a turnkey service
“Turnkey” doesn’t always mean the same thing for every supplier. Before comparing offers, it pays to check item by item what is included in the price and what remains the exhibitor’s responsibility.
| 🧾 Item | ✅ Usually included | 🔍 To check |
|---|---|---|
| 📐3D design and detailed drawings | Yes | Number of revisions included |
| 📋Paperwork with the show’s technical office | Yes | Structural calculations for mezzanines |
| 🪚Production of structures and furniture | Yes | Materials and finishes described in detail |
| 🖼️Graphics printed and applied | Often | File layout and adaptations |
| ⚡Electrical installation and lighting | Yes | Connection and power ordered from the show |
| 🚚Transport, installation and dismantling | Yes | Surcharges for night or holiday work |
| 🚰Show services (water, internet, rigging) | Not always | Who orders and pays for them |
| 🖥️Rental furniture, screens, LED walls | Depends | Precise list in the quote |
| 🧹Daily cleaning and on-site support | Depends | Availability during opening days |
| 🏬Storage after the show | Rarely | Annual cost and conditions |
Having this list in front of you lets you compare different offers properly and avoid surprises on the final invoice. A complete guide to the points to check is in our guide to the contract with the stand builder.
A complete example: a 36 m² turnkey stand in Verona
A winery exhibits at a major wine fair in Verona with a 36 m² corner stand. The brief asks for a tasting counter at least five metres long, a display wall for bottles with dedicated lighting, a small meeting area with table and chairs, a refrigerated store room for wines and a sink for glasses. The image must evoke the vineyards and the company’s tradition, but in a contemporary tone.
The turnkey supplier prepares two concepts, develops the chosen one with renderings and wood and stone samples, handles the paperwork with the fair, including the water connection request, and produces the stand in the workshop. At the show the crew installs it in two days and hands it over with the bottles already on the shelves, the fridge running and the glasses ready. During the show a technician is on call; after closing the stand is dismantled and taken into storage for the next edition. The total cost, including one year’s storage, comes to roughly €18,000–26,000. For sector ideas, read our guide to the right stand for every sector.
Turnkey and multi-year reuse
The advantage of turnkey grows when the stand is used for several shows. The stand builder knows the stand, stores it, checks it and adapts it to different floor areas. The exhibitor only needs to communicate the next show and any product news: the rest is handled with the same level of quality. Many companies sign annual or multi-year agreements, with a show calendar and agreed prices, obtaining a lower average cost per event and simpler planning. In this way the stand becomes a real company asset, not an expense to repeat every time.
The role of the project manager
In a turnkey service the key figure is the project manager: the person who follows the project from start to finish and whom the exhibitor can call at any time. They coordinate designers, workshop, graphic designers, electricians, hauliers and installation crews; keep in contact with the show’s technical office; monitor deadlines and budget; flag any problems in advance and propose solutions. A good project manager knows the rules of the main exhibition centres, speaks the languages needed for shows abroad and can handle last-minute issues without passing them on to the client.
Before signing, it is worth asking who the project manager will be, how they can be contacted during installation and the show, and whether they will personally oversee the site. It is a guarantee of continuity worth more than many sales promises.
Turnkey abroad too
The turnkey service is particularly useful for shows outside Italy, where rules, language, logistics and local suppliers can create difficulties. The stand builder produces the stand in Italy, organises transport, handles paperwork with the foreign organiser and brings its own crews for installation. The exhibitor finds the stand ready, just as in Italy. For details on the organisation, read our guide to stands for shows abroad.
Summary
A turnkey stand lets the exhibitor focus on clients, products and appointments, leaving design, production, paperwork, logistics, installation and dismantling to the stand builder. To choose well, check precisely what is included, get to know the project manager who will follow the work and consider reusing the stand at several shows, which makes the service even better value over time.
Your turnkey stand with GECS Group
We follow every stand from brief to dismantling with a single project manager, in-house design, production in our workshop in Italy and our own installation crews in Italy and Europe. Send us the show, floor area and goals to receive a first concept with a cost estimate.
Frequently asked questions
Quick answers to the questions we hear most often
Can I supply some furniture or the graphics myself?
Yes, turnkey can be adapted: the stand builder integrates items the exhibitor already owns into the design, checking their dimensions and compliance.
Who is responsible if something doesn’t work during the show?
With turnkey, the stand builder is: they must guarantee availability and respond quickly to damaged lights, furniture or graphics.
Does turnkey pay for small stands too?
Yes: even for 9–16 m² it avoids coordinating different suppliers and handling the show’s paperwork and schedules. Small stands often use modular systems, at limited cost.
Does turnkey cost more than organising it yourself?
Usually not: a single supplier avoids overlaps, measurement errors and unnecessary trips. You also save a lot of internal time.
Can I reuse the stand at other shows?
Yes. A custom stand designed in modules adapts to different floor areas by changing only a few walls and the graphics.
Do you also handle paperwork with the organiser?
Yes: submitting the design, ordering connections and services, passes for the installation crew.
Do you also work outside Italy?
Yes. We design and produce in Italy and install turnkey stands throughout Europe and worldwide.
Want a turnkey stand?
We design, produce in Italy and install your stand throughout Europe: one contact from brief to dismantling.