Stand builder contract and stand insurance: what to check before signing

Stand builder contract and stand insurance: what to check before signing

What to check in the stand builder contract and stand insurance: quote, timing, payments, ownership, cover, damage and dismantling.

Entrusting a stand to a stand builder means entrusting them with a large share of the annual marketing budget and, above all, your image in front of customers and competitors. Yet many contracts are closed with a one-page quote, a handshake and a few emails. As long as everything goes well there is no problem; when something goes wrong (a delay, damage, an unforeseen item, a dispute over the hall floor) you realise nothing was written down.

In this guide we look at what to check before signing: the quote items, timing and penalties, payments, ownership of the design and the stand, insurance, damage handling and handing back the space after dismantling. These are practical pointers based on our experience as stand builders, not legal advice: for important contracts it is always worth consulting a professional.

In short: the quote should list each item separately and state clearly what is excluded. The contract sets delivery dates, approvals, payment terms and what happens in case of delays or changes. Ownership of the design and the stand, both parties' insurance cover and the procedure in case of damage, including damage to the hall, must be clarified.

1. The quote: what must be included

Reviewing the stand quote

The first document to read carefully is the quote. A clear quote lists items one by one: design, structures and walls, raised floor and flooring, furniture, graphics, electrics and lighting, transport, build-up and dismantling, venue services, storage if any. A single “turnkey” price is convenient, but makes it hard to understand what you are paying for and to compare different offers.

📄 Item✅ What to check⚠️ Often excluded
🧱Structures and furnitureMaterials, finishes, purchase or hireSpecial furniture, fridges
🖨️GraphicsDesign, printing, installation, number of revisionsGraphic design from scratch
💡ElectricsLight points, sockets, certificationVenue power connection
🚚TransportReturn trip, packing, forkliftsHandling at the venue
🛠️Build-up and dismantlingCrews, hours, travelNight shifts, overtime
📋Venue services and paperworkDesign submitted to the organiser, inspectionsVenue fees and technical services

Just as important is the exclusions section: connections, rigging, cleaning, waste disposal, hostesses, catering, insurance. These are not necessarily the stand builder's job, but they must be written down, so you know who handles them and what they cost. For an overview of total costs, read our guide on how much an exhibition stand costs.

2. Timing, approvals and penalties

Production and build-up schedule

The contract should contain a schedule: by when the client provides the brief, logos and graphic files, by when the stand builder presents the design, by when the design must be approved, when production starts, when the stand is delivered at the show. Deadlines apply to both parties: if graphic files arrive late, the stand builder cannot guarantee the delivery date without extra costs.

It is also useful to set out how changes after approval are handled. Changing a colour two weeks before the show may cost little; adding a meeting room or a mezzanine may require new calculations, new materials and more crews. A simple rule is that every change is quoted in writing and approved before being carried out.

Penalties for late delivery of the stand are rare in exhibition contracts, but for strategic shows they can make sense. More often it is agreed that the stand must be ready and tested by the evening before opening, with a joint walk-through to check that everything matches the design.

3. Payments and deposits

Signing the contract with the stand builder

In the exhibition industry it is normal to ask for a deposit on confirmation, because the stand builder has to buy materials and start production weeks before the show. The most common formulas are 50% on signing and 50% before delivery, or 40% on signing, 40% at the start of production and 20% after the show. For small stands or installation-only work, 50/50 is common.

The contract must state amounts, due dates, payment methods and what happens in case of late payment. It should also clarify whether prices exclude VAT, how extra costs are invoiced (travel, overtime, venue services advanced by the stand builder) and whether there are cancellation costs if the show is postponed or the exhibitor withdraws.

The cancellation clause is often forgotten. If the exhibitor withdraws a few days before the show, the stand has already been produced: it is fair for the contract to set in advance how much is owed depending on the stage reached.

4. Ownership of the design and the stand

Stand elements in storage

Two questions to clarify before signing: who owns the design and who owns the stand after the show. The creative design, unless otherwise agreed, remains with the stand builder who created it: the exhibitor can use it for that show, but cannot necessarily have it built by another supplier. If you want the freedom to reuse the design with anyone, it must be written down.

The physical stand can be bought or hired. In the first case it becomes the exhibitor's property, who can reuse it, keep it in storage or have it rebuilt. In the second, the structures return to the stand builder after the show, and the exhibitor only owns what is customised, such as graphics. The cost differences are significant, as we explain in our guide to exhibition stand hire.

If the stand is bought and kept by the stand builder, the contract should also state the storage cost, storage conditions and who is liable for any damage while in custody.

5. Insurance: who covers what

Insurance consultation for the show

At a show there are several different risks and therefore several types of cover. The stand builder should have third-party and employer's liability insurance, covering damage caused during work (for example a wall falling on a visitor or a neighbouring stand). The exhibitor usually has their own liability cover for damage caused during the show and, often, the show itself offers or requires specific cover.

🛡️ Cover🎯 What it protects👤 Who usually takes it out
🧑‍⚖️Third-party liabilityDamage to third-party people and propertyStand builder and exhibitor
📦All risks for goods and standDamage, theft, fire to exhibits and the standExhibitor
🏛️Show policyMinimum cover required by the regulationsExhibitor through the show
👷Workers' accident coverBuild-up crewsStand builder

All risks insurance protects the exhibitor's goods (products, stand, equipment) against damage, theft and fire during transport, build-up, the show and storage. It is particularly important for expensive machinery, jewellery, artworks or technology products. Before the show it is worth asking the stand builder for a copy of their insurance certificate and checking with your own broker that the cover leaves no periods or activities uncovered.

6. Damage, dismantling and handing back the space

Checking the floor after dismantling

At the end of the show the space must be handed back to the organiser clean and undamaged. Scratched floors, holes, glue residue, paint or silicone stains are charged to the exhibitor, who in turn can claim from whoever caused the damage. To avoid disputes, the best solution is to document the condition of the space: photos and video of the floor on arrival, before build-up starts, and again at hand-back, after dismantling.

The contract should state who protects the floor during work (sheets, cardboard, boards), who checks the space at the end of dismantling and how disputes are handled. In historic venues or locations with delicate floors, such as galleries, museums and palaces, these rules are even more important: the organiser often requires specific protection and a joint check with their own representative. We also cover this in our guide to exhibition and museum installations.

If damage occurs during the show, it must be reported immediately in writing to the organiser and the stand builder, with photos and a description. Reports made weeks later are much harder to handle with insurers.

💬 Received several quotes and can’t compare them? Send them to us: we will help you see what is included and what is missing, item by item. Ask for a comparison →

How to compare several quotes

Asking for three or four quotes is a good habit, but comparing them is often difficult: each stand builder describes items differently, some include transport and build-up, others don't, some propose cheaper materials without saying so. The risk is choosing the lowest price and discovering later that half the work was missing.

The simplest method is to prepare a comparison table with the same rows for everyone: design, structures, flooring, furniture, graphics, lighting and electrics, transport, build-up and dismantling, venue paperwork, storage, exclusions. For each stand builder you write the price and, next to it, exactly what it includes. Empty boxes immediately show what is missing.

Beyond price, it is worth assessing other factors: whether the stand builder produces in-house or subcontracts, whether they have employed build-up crews, whether they have experience at that show or in that country, whether they provide references and photos of real projects, whether they are qualified to issue electrical certifications. A slightly higher but complete and clear quote often costs less than a cheap one full of items to add. You will find more criteria in our guide on how to choose a stand builder.

The stand hand-over inspection

One step we always recommend including in the contract is the hand-over inspection, the evening before opening or that same morning. Exhibitor and crew leader walk round the stand together and check that everything matches the approved design: dimensions, finishes, graphics, lights, sockets, furniture, keys for storerooms and display cases. Small corrections are noted and carried out immediately, before visitors arrive.

At the end a short report is signed, even just by email, closing the build-up phase. The same goes for dismantling: a final check of the space, with photos, closes the show. It takes a few minutes, avoids disputes in the following months and makes cooperation easier for future shows.

Mistakes to avoid

  1. Signing a single price without detail. It is impossible to understand what is included.
  2. Not reading the exclusions. Excluded items turn into unexpected invoices.
  3. Verbal changes only. Every variation should be quoted and approved in writing.
  4. Ownership not clarified. Whether the stand is bought or hired changes everything after the show.
  5. Taking insurance for granted. Without checking, transport or storage may be left uncovered.
  6. No photos of the space. Without evidence it is hard to dispute a damage charge.

Checklist before signing

Before signing, go over these points with the stand builder. If any is missing, ask for it to be added in writing: a few extra lines in the contract or order confirmation are enough.

  • Quote with all items separated and exclusions written down.
  • Schedule with deadlines for client and stand builder.
  • Rule for changes after design approval.
  • Deposits, balance, payment methods and cancellation clause.
  • Ownership of the design, the stand and the graphics.
  • Stand builder's liability insurance certificate and check of your own all-risks policy.
  • Procedure for floor protection, photos and handing back the space.

Frequently asked questions

Quick answers to the questions we hear most often

📋

Is a 50% deposit normal?

Yes, it is common practice, because the stand builder buys materials and starts production well before the show.

🏛️

Is a purchased stand really mine?

Yes, if the contract says so. The creative design, however, often remains with the stand builder unless otherwise agreed.

🏛️

Who pays if the stand damages the hall floor?

The organiser usually charges the exhibitor, who can claim from whoever caused the damage. Before-and-after photos help clarify responsibility.

💬

Is all-risks insurance necessary?

It is recommended when exhibiting valuable goods or when the stand itself is worth a lot.

🏛️

What happens if the show is postponed?

It depends on the contract: it is wise to agree in advance how costs already incurred and new dates will be handled.

💶

Are your quotes detailed?

Yes, each item is listed separately, with timing, payments and cover in writing.

💶

Is the lowest quote always the best value?

Not always. A very low price often excludes important items such as transport, build-up, electrics or venue paperwork, which then have to be paid separately. Compare quotes with the same items.

🏛️

Who handles the paperwork with the show organiser?

Usually the stand builder, on the exhibitor's behalf: design, certificates and, if needed, inspections. The contract should state this explicitly, together with the cost of the venue's technical services.

Handshake between exhibitor and stand builder in front of the stand – GECS Group

Want a clear contract with no surprises for your next stand?

Our quotes list every item separately, with written timing and payments, insurance cover stated and a crew leader responsible from build-up to handing back the space.

Request a free quote →

Request a project

Tell us about the exhibition stand or commercial space you have in mind. We’ll get in touch to discuss the next steps.

DISCUSSION

Comments

Share your thoughts or ask a question about this article.

No comments yet. Be the first.