What a trade fair’s technical regulations say, which rules apply to your stand and which documents to send to the organiser, with deadlines and practical tips.
Every trade fair has technical regulations: a document, often dozens of pages long, that sets out how a stand may be built at that venue. Maximum heights, distances from boundaries, permitted materials, suspended loads, build-up hours, documents to submit. Many exhibitors only discover it when the show’s technician stops the build-up because a wall is too high or a certificate is missing. At that point, fixing it costs time, money and nerves.
In this guide we explain what technical regulations usually contain, which rules affect the design most and which documents are needed, with typical deadlines. Rules vary from venue to venue and even between events at the same venue: what follows is a general overview, always to be checked against your own show’s document.
In short: read the regulations before designing, not after. The most important rules concern heights, walls facing neighbouring stands, openings onto aisles, fire rating of materials, electrics, rigging and double-deck structures. The design must be sent to the organiser by the stated deadline, with dimensioned drawings, certificates and, for complex structures, calculations signed by an engineer.
1. What the technical regulations are and where to find them
The technical regulations are part of the documentation the organiser sends the exhibitor after the application is signed, together with the general terms, the services catalogue and the exhibitor manual. They can usually be downloaded from the exhibitor area of the show’s website. Sometimes there is a single document for the whole venue, sometimes there is a specific appendix for the individual event, with additional rules on heights or hours.
The document should be passed to the stand contractor immediately, together with the hall plan showing the stand’s position. Three pieces of information matter most for the design: the stand type (row, corner, peninsula, island), the exact dimensions of the space and the presence of columns, hydrants, panels or emergency exits in the area. An unreported pillar in the middle of the stand can change the whole design.
If the regulations are in another language or contain unclear rules, it is worth asking the show’s technical office for clarification in writing: an email reply is worth much more than a personal interpretation when the inspection in the hall comes.
2. Heights, distances and openings onto aisles
Rules on dimensions are those that most affect the shape of the stand. Every hall has a maximum build height, often between 3 and 6 metres, which can only be exceeded with approval. Walls facing neighbouring stands must be closed, finished and neutral on the neighbour’s side, usually white, above a certain height. Graphics and logos must be set back from the boundaries by a minimum distance, so as not to visually “invade” the stand next door.
| 📏 Rule | 📌 Typical value | ⚠️ What to check |
|---|---|---|
| ⬆️Maximum height | 3–6 m depending on the hall | Different heights for walls and rigged structures |
| ↔️Graphics set-back | 0.5–1 m from boundaries | Logos facing neighbouring stands |
| 🧱Walls facing neighbours | Closed, finished, neutral | Colour and finish of the back |
| 🚪Aisle frontage | Open for a minimum share | Percentage of closed wall allowed |
| 🔦Exits and hydrants | Always clear and visible | Clearance distances |
Many shows also require the sides facing aisles to remain open for a minimum share, so as not to create “closed boxes” that reduce visibility across the hall. If closed meeting rooms are wanted, they should be placed towards the inside or towards the boundaries. We covered this in our guide on closed or open stands.
3. Materials and fire rating
All materials used on the stand must have an adequate fire reaction class, certified by the manufacturer. This applies to panels, fabrics, carpet, curtains, decorations and graphics too. In Italy, European classes (for example B-s1,d0) or the old Italian classes (class 1) are used, depending on the material. The regulations state which classes are required and often ask you to bring copies of the certificates to the show.
Untreated natural materials such as raw wood, cardboard or dried plants may be forbidden, or allowed only if treated with certified fire retardants. The treatment must also be documented. The show’s technicians may carry out spot checks and ask for anything not compliant to be removed. For details, see our guide to fire reaction classes for stands.
The practical advice is to ask the stand contractor for a file with all the certificates for the materials used and to keep a copy on the stand for the whole event: in case of inspection you just show it.
4. The design to submit to the organiser
Almost all shows require the stand design to be submitted for approval by a deadline that usually falls 4–8 weeks before opening. It is not needed for shell-scheme stands supplied by the organiser; for custom stands it is mandatory. The design includes a dimensioned plan, elevations with heights, materials and, where present, electrics, rigging and double-deck structures.
| 📄 Document | 🗓️ When | 👤 Who prepares it |
|---|---|---|
| 📐Dimensioned plan and elevations | 4–8 weeks before | Stand designer |
| 🏗️Structural report and calculations | With the design, for tall structures or double decks | Licensed engineer |
| 🔥Fire reaction certificates | At the show, available on request | Contractor and suppliers |
| ⚡Electrical certificate of conformity | Before opening | Licensed company |
| 📋Site safety documents | Before build-up | Contractor and exhibitor |
The show’s technical office may approve, request changes or reject. Submitting early always pays: if changes are requested there is time to correct them without stopping production. For electrics and the related certification, see our guide to stand electrical installation.
5. Rigging and double-deck stands: calculations and inspections
Rigged structures hung from the hall ceiling (trusses, ceiling elements, suspended signs) and the upper floors of double-deck stands are the parts with the strictest rules. For rigging, the show indicates the available hanging points, the maximum load per point and who may carry out the work: often only the venue’s technical service or accredited companies. Trusses must be certified and the load calculated.
Upper floors require a structural design signed by an engineer, load calculations (usually at least 300–500 kg per square metre), compliant stairs and railings, and often an inspection at the show before opening, with a certificate. Some venues also require specific insurance. We go into detail in our guides to rigging and double-deck stands.
These documents take time: a structural calculation is not prepared in a day. For stands with an upper floor, it is best to start the design at least three months before the show.
6. Build-up and dismantling: hours, access and passes
The regulations also set out when and how work is done in the hall: build-up days and hours, any paid night shifts, rules for vehicle access, unloading areas, use of forklifts and platforms, waste disposal. Vehicles often enter only with a pass and in set time slots; staff must be registered and wear badges.
During build-up, construction site safety rules apply: helmets and safety shoes, no work at height without protection, aisles kept clear. At the end of the show the space must be returned clean and with no damage to the floor: any abandoned waste or damage is charged to the exhibitor. For safety, read our guide on build-up safety and site documents.
💬 Are your show’s regulations a hundred pages long? Send them to us with the size of your space: we check the rules and prepare the design to submit to the organiser. Ask for a check →
Different regulations in Italy and abroad
Italian shows have similar regulations, but with differences that matter: different maximum heights between halls of the same venue, specific rigging rules, different procedures for design approval. Abroad, the differences grow. In Germany, for example, many venues require detailed structural documentation even for stands of medium height and apply very strict checks on materials; in France and the United Kingdom, forms, fire classes and electrical rules change; in the Gulf countries local standards apply, with approvals from specific bodies.
That is why, when exhibiting outside Italy, the regulations must be read even more carefully, and it pays to work with a contractor who knows the venue. We handle stands all over Europe, in the UK and in the Middle East, and prepare documents in the language and format required by the show, as we explain in our guide to stands for shows abroad.
One last tip: keep the regulations of the shows you attend every year. Rules change little from one edition to the next, and starting from the previous year’s document helps you spot what is new straight away.
How to read technical regulations in half an hour
Eighty pages of regulations are daunting, but not everything is equally important for whoever builds the stand. The method we use is simple and lets you extract in half an hour the information that really matters for the design and the organisation.
Start with the table of contents, looking for the sections on stand construction, heights, electrics, safety and deadlines. Then open the calendar: dates for submitting the design, ordering technical services, build-up and dismantling, with any surcharges for latecomers. These dates should be copied straight into the project calendar and shared with the whole team.
The third step is the dimensions: maximum height of the hall where the stand is located, set-backs from boundaries, the height above which walls facing neighbours must be neutral, the share of open frontage. Note them on a one-page sheet together with the stand type and the position of columns and hydrants. Finally, read the parts on materials, electrics and special structures, noting which certificates and calculations are needed and who must sign them.
The result is a short summary sheet that accompanies the project from start to finish. The designer uses it to draw, the build-up crew to organise themselves and the exhibitor to know which documents to keep on the stand. When something is unclear, a written question to the technical office resolves any doubt before it becomes a problem in the hall.
This sheet can also be reused for the next edition: just compare it with the new regulations and mark the differences, instead of rereading everything from scratch every year.
Mistakes to avoid
- Designing without reading the regulations. The risk is redoing the design or, worse, modifying the stand at the show.
- Ignoring deadlines. Designs submitted late pay surcharges or are not approved.
- Graphics facing neighbours. Logos on the backs of walls bordering other stands must be covered.
- Materials without certificates. Without documents, the material may have to be removed.
- Improvised rigging. Nothing is hung without approval and calculations.
- Covered emergency exits. Hydrants, extinguishers and exits must always remain clear and visible.
Technical regulations checklist
- Regulations and hall plan sent to the contractor right after registration.
- Maximum height and wall rules checked for your hall.
- List of materials with fire reaction classes.
- Design submission deadline marked in the calendar.
- Calculations and inspections planned for upper floors and rigging.
- Technical services (electricity, water, rigging) ordered on time.
- Build-up hours, vehicle passes and staff registration.
Frequently asked questions
Quick answers to the questions we hear most often
Are technical regulations the same at every show?
No. The basic rules are similar, but heights, deadlines and procedures change from venue to venue and sometimes between different events.
Who has to submit the design to the show?
Formally the exhibitor, but it is usually prepared and submitted by the stand contractor on their behalf.
What happens if the stand does not comply with the regulations?
The show’s technicians may request changes, suspend build-up or, in serious cases, not allow the stand to open.
Can I exceed the maximum height?
Sometimes yes, with a prior request and approval, often for a fee and with additional rules for the walls.
Are structural calculations always needed?
Only for structures above certain heights, upper floors and rigging; for a simple stand, drawings and material certificates are enough.
Do you handle the approval?
Yes, we prepare the design and documents and follow the dialogue with the show’s technical office until approval.
Want a stand approved on the first submission, with no surprises during build-up?
We design your stand starting from the show’s technical regulations, prepare drawings, calculations and certificates, and handle the approval ourselves, in Italy and abroad.