Exhibition stand transport and logistics: packing, vehicles, venue access, abroad and storage

Exhibition stand transport and logistics: packing, vehicles, venue access, abroad and storage

How to organise exhibition stand transport: packing, vehicles, venue access, handling, shipping abroad, storage and indicative costs.

A stand can be perfectly designed and built, but if it arrives at the show late or damaged, all that work is at risk. Logistics is the least visible part of exhibition build and one of the most delicate: dozens of elements of different shapes have to be packed, loaded in the right order, brought in within the venue's access times, unloaded in the hall alongside hundreds of other vehicles and, at the end of the show, everything has to be done in reverse in half the time.

In this guide we go through stand transport step by step: packing, choice of vehicle, venue entry, handling in the hall, shipping abroad with customs and documents, storage between shows and indicative costs. It is closely linked to installation, which we cover in our guide to stand build-up and dismantling.

In short: a stand is packed to protect its finishes and to be loaded in build-up order. The vehicle is chosen by volume and venue access. You enter the venue with passes and time slots, and unloading needs forklifts and authorised staff. Abroad, allow more time and, outside the European Union, customs documents. Between shows the stand is kept in a dry, well-organised storage facility.

1. Packing: protect and organise

Packing the stand elements

Good packing has two goals: to protect surfaces and to organise the build-up. Lacquered walls and wooden panels are wrapped in protective film and moving blankets; corners get edge protectors; counters and delicate furniture travel in custom wooden crates. Fabric graphics are folded into labelled bags, spotlights and small components go into numbered boxes.

Each package gets a label with its number, contents and the stand area it belongs to. The packing list travels with the load and, on arrival, lets you check in a few minutes that nothing is missing. It is also the document you need in case of damage or loss, and for insurance.

Packing should be designed to be reused: crates and protections that come back to the workshop after the show are used for dismantling and for future shows. They also reduce the waste to be disposed of at the venue, which exhibition centres charge for by weight.

2. The right vehicle: van, truck or articulated lorry

Loading the truck with the stand

The choice of vehicle depends on the stand's volume and the venue's access. A 12–16 m² stand with fabric walls and little furniture often fits in a van; a 40–60 m² stand with wooden walls, a raised floor and furniture needs a truck; a 100 m² island or double-deck stand can fill one or more articulated lorries.

🚚 Vehicle📦 Volume and typical use💶 Indicative cost in Italy
🚐VanUp to 15–20 m³, small and modular stands€1.2–1.8/km
🚛Truck with tail lift30–45 m³, medium wooden stands€1.8–2.5/km
🚚Curtain-sider lorry80–90 m³, large and double-deck stands€2.2–3.0/km
🧳GroupageA few packages with other goodsper package or per cubic metre

A truck with a hydraulic tail lift is often the best choice for medium stands: it can unload even where no forklift is available. A curtain-sider, open at the side, is unloaded faster with a forklift. In every case loading is done in reverse build-up order: what is needed first (floor, structures) is loaded last, so it is the first to come off.

3. Entering the venue: slots, passes and times

Queue of vehicles at the exhibition centre entrance

During build-up days hundreds of vehicles try to enter the same halls. To avoid chaos, many exhibition centres use booked entry slots, vehicle passes and waiting areas. The vehicle enters at its assigned time, unloads within a limited window and must then leave to make room for others. Anyone arriving outside their slot may have to wait for hours.

Passes are requested in advance through the exhibitor's or contractor's online area, with the vehicle's number plate and the driver's name. Some shows ask for a deposit that is refunded if the vehicle leaves on time. Hall access times are also fixed: night work is charged extra.

It is also important to know the stand's position relative to the hall doors. A stand far from the goods entrance takes longer to unload and needs more internal moves with pallet trucks or forklifts. All of this is in the technical regulations, which we cover in our guide to trade show technical regulations.

4. Handling in the hall: forklifts and staff

Forklift operator unloading a crate in the hall

Once the vehicle is in, the material has to be unloaded and brought to the stand. Heavy packages need forklifts, which at many venues may only be operated by the show's handling service or authorised companies, for a fee. The service must be booked in advance with day, time and number of packages.

For light packages, pallet trucks, trolleys and the crew's arms are enough. Here too organisation matters: a packing list with destination zones lets you place each element right next to where it will be installed, avoiding moving it several times. Empty packaging and crates then go into the stand's storeroom or to the venue's empties storage service.

Handling is also the moment with the greatest safety risks. We cover this in our guide to build-up safety, DUVRI and POS.

5. Shows abroad: timing, documents and customs

Truck crossing the Alps on the way to a show

Taking a stand abroad takes more time and more paperwork. Within the European Union goods move freely: you need the transport document, the packing list and, if the stand returns to Italy, documentation proving these are goods temporarily exported for a trade show. Travel times should be calculated with a margin, allowing for weekend and public-holiday bans on heavy goods vehicles in several countries.

For countries outside the Union, such as the United Kingdom, Switzerland or the UAE, customs procedures are needed. For trade shows the ATA carnet is often used: a document that allows temporary import without paying duties, provided everything returns. Alternatively, temporary import procedures are handled by specialised forwarders. Preparation can take a few weeks.

📍 Destination🗓️ Travel time from Padua💶 Notes
🇮🇹Italy (Milan, Bologna, Verona, Rimini)Same dayTransport document only
🇩🇪Germany (Munich, Frankfurt, Düsseldorf)1–2 daysWeekend driving bans
🇫🇷France (Paris, Lyon)1–2 daysAlpine tolls, crossing times
🇬🇧United Kingdom (London, Birmingham)2–3 daysCustoms, ATA carnet or temporary import
🇦🇪UAE and Saudi ArabiaSea 3–4 weeks or airForwarder and local procedures

For distant destinations, producing some parts locally or using lightweight modular structures shipped by air is also considered. We cover this in our guide to stands for shows abroad.

6. Storage and return between shows

Stand storage on racking

At the end of the show the stand is dismantled, packed and returned to the workshop. There it is checked for damage, elements are cleaned and repaired, fabric graphics are washed and worn parts replaced. Then the stand goes into storage, in a dry, organised warehouse, with elements on racking and an up-to-date inventory.

Storage usually costs a monthly fee based on volume, but it allows the stand to be reused at several shows, changing only graphics and small details. For companies that exhibit several times a year it lowers overall costs considerably. We go deeper in our guide on what to do with the stand after the show.

💬 Need to ship your stand to another city or abroad? We take care of packing, transport, venue access and the return to storage. Plan the transport →

How much stand logistics costs

For a show in Italy 200–300 km from the workshop, logistics for a medium stand (40–60 m²) costs roughly €1,500–3,500 including return transport, packing, handling at the venue and passes. For a show in Germany or France it reaches €3,000–7,000, and for the United Kingdom €5,000–10,000 with customs procedures. Storage between shows usually costs €50–200 per month for medium stands.

What saves money is planning (no rush transport), stands designed to take up little volume, reusable packaging and coordinating transport and build-up with the same company, which avoids dead time and idle vehicles.

Transport insurance

During transport a stand can suffer knocks, falls, theft or weather damage. The carrier is only liable within limits set by law, often very low compared with the value of a custom stand. That is why it pays to check whether the stand is covered by an all risks policy including transport, build-up, the show and storage. It is one of the points to check in the contract with the stand builder, together with who pays in case of damage. We cover this in our guide to the stand builder contract and insurance.

The logistics plan: one page that prevents many problems

For each show it is worth preparing a one-page logistics plan, shared between exhibitor, stand builder, haulier and crew leader. No complicated software is needed: just a clear document with all the information you would otherwise be hunting for on the phone at the worst moments.

  • Dates and times: departure from the workshop, venue entry slot, start and end of build-up, dismantling time and vehicle exit time.
  • Vehicles: vehicle type, number plate, driver's name and phone, passes requested and confirmed.
  • Access: hall, goods entrance, stand position, vehicle parking area.
  • Services: forklift and staff booked, empties storage, waste disposal.
  • Packages: total number, indicative weights, fragile or oversized items, list attached.
  • Exhibitor's products: how and when they arrive, who receives them at the stand, where the packaging is kept.
  • Contacts: crew leader, exhibitor's contact person, the show's technical office.

A point often forgotten is the exhibitor's own products: machinery, samples, promotional material. If they arrive with a separate courier, someone has to receive them at the venue and know where to put them; if they come in the staff's car, you need to know where to park and how to enter the hall. Including them in the logistics plan avoids a stand that is ready but empty on the first day of the show.

Mistakes to avoid

  1. Improvised packing. Lacquered walls without protection arrive scratched.
  2. Loading in the wrong order. Hours are lost looking for the floor under the furniture.
  3. Passes and slots not booked. The vehicle waits outside the venue for hours.
  4. Forklift not booked. Without one, heavy packages don't come off.
  5. Tight timing abroad. Driving bans and customs make journeys longer.
  6. No inventory. Without a packing list it is impossible to notice what is missing.

Frequently asked questions

Quick answers to the questions we hear most often

🏛️

How early should the stand leave for a show in Italy?

Usually the day before or the morning of build-up, depending on distance and the assigned entry slot.

💬

Do I need an ATA carnet for Switzerland?

For temporary export to Switzerland, which is not in the European Union, an ATA carnet or an equivalent customs procedure is often used.

🚚

Can I ship the stand with a normal courier?

For a few light packages yes, but for whole stands dedicated transport is better, with times and unloading coordinated with the build-up.

🏛️

Who pays for forklifts at the show?

Usually the exhibitor, through the stand builder, according to the price list of the show's handling service.

🏛️

Do you store the stand after the show?

Yes, we have a storage facility where we keep, check and prepare stands for future shows.

🚚

Do you transport stands to the Middle East as well?

Yes, with trusted forwarders and build-up crews who work regularly at those venues.

🏛️

Is the stand insured during the journey?

It depends on the policy. Before departure, check that transport, build-up, the show and storage are covered, and for what value.

💬

Can the same vehicle be used for the outward and return trip?

Yes, and it is often the cheapest solution for nearby shows. For distant ones the vehicle can return empty and set off again for dismantling.

Finished stand set up at the show – GECS Group

Want your stand to arrive at the show on time and without a scratch?

We build in Italy, pack with care, transport with dedicated vehicles all over Europe and keep your stand in our storage between one show and the next.

Request a free quote →

Request a project

Tell us about the exhibition stand or commercial space you have in mind. We’ll get in touch to discuss the next steps.

DISCUSSION

Comments

Share your thoughts or ask a question about this article.

No comments yet. Be the first.